Connectivity, ordered in time.

Lines, failover and the network inside the building. Usually the longest lead time in any move, and the one most often left too late.

Yellow fibre-optic cables fanning out of patch trays
Our own servers, since 2002In secure UK facilities

What decides your move-in date.

Connectivity is ordered months ahead and arrives when it arrives. It is the single most common reason an office move slips, and almost always because it was raised after the lease was signed.

We get it on the critical path early, and plan a fallback for the gap if the date moves.

What this involves.

Lines and circuits

Specified for how many people will use them and what they will be doing, not for the headline speed.

Failover

A second route that takes over automatically, which matters far more once the phones run over the same connection.

In-building network

Switching, cabling and wireless that covers the whole floor rather than the half nearest the router.

Coordinated with the move

Ordered against your actual date, with the supplier chased by us.

One accountable partner for all of it.

Thirty minutes with a senior engineer, then a written one-page summary you keep whether or not you work with us.

  • Twenty to thirty minutesWith a senior engineer, on a video call.
  • A written summary you keepOne page, yours whether or not we ever work together.
  • No obligationNothing to sign at the end, and no pressure to.
CallFree Review